{"id":2289,"date":"2005-11-30T00:00:00","date_gmt":"2005-11-30T00:00:00","guid":{"rendered":"https:\/\/mercator.nfdtesting.uk\/propulsion-and-future-fuels-conference\/2005\/11\/30\/stolt-offshore-charters-new-build-imr-and-survey-ship\/"},"modified":"2005-11-30T00:00:00","modified_gmt":"2005-11-30T00:00:00","slug":"stolt-offshore-charters-new-build-imr-and-survey-ship","status":"publish","type":"post","link":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/news\/general-news\/stolt-offshore-charters-new-build-imr-and-survey-ship\/","title":{"rendered":"Stolt Offshore charters new build IMR and survey ship"},"content":{"rendered":"<p>Stolt Offshore has entered into an agreement with Eidesvik Shipping AS to charter a new build ship for the inspection, maintenance, repair (IMR) and survey market for a period of 8 years, plus options for a further 12 years. The charter commences on delivery of the ship in mid 2007.<\/p>\n<p>The ship, which will be built at the Norwegian shipyard Flekkefjord Slipp &amp; Maskinfabrikk AS, will be 95metres long, with a moonpool, a high specification ROV system and survey suite, and will meet the latest environmental criteria.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stolt Offshore has entered into an agreement with Eidesvik Shipping AS to charter a new build ship for the inspection, maintenance, repair (IMR) and survey market for a period of 8 years, plus options for a further 12 years. The charter commences on delivery of the ship in mid 2007. The ship, which will be [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"sponsor":[],"class_list":["post-2289","post","type-post","status-publish","format-standard","hentry","category-general-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/2289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/comments?post=2289"}],"version-history":[{"count":0,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/2289\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/media?parent=2289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/categories?post=2289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/tags?post=2289"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/sponsor?post=2289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}