{"id":2471,"date":"2007-03-16T00:00:00","date_gmt":"2007-03-16T00:00:00","guid":{"rendered":"https:\/\/mercator.nfdtesting.uk\/propulsion-and-future-fuels-conference\/2007\/03\/16\/way-ahead-for-lcs-programme\/"},"modified":"2007-03-16T00:00:00","modified_gmt":"2007-03-16T00:00:00","slug":"way-ahead-for-lcs-programme","status":"publish","type":"post","link":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/news\/general-news\/way-ahead-for-lcs-programme\/","title":{"rendered":"Way ahead for LCS programme"},"content":{"rendered":"<p>Based on a comprehensive review of the Littoral Combat Ship (LCS) acquisition program, Secretary of the Navy Donald C. Winter said he is prepared to lift a previously issued stop work order for construction of LCS 3. The ship is currently under contract to Lockheed Martin Corp. Maritime Systems &amp; Sensors unit, Moorestown, N.J. Lifting the stop work order is contingent upon the Navy and Lockheed Martin reaching agreement on a renegotiated contract.<\/p>\n<p>As a result of a nearly two-month assessment, the Navy has revalidated the war-fighting requirement and developed a restructured program plan for the LCS that will improve management oversight, implement more strict cost control, incorporate selective contract restructuring and ensure that an important war-fighting capability is provided to the fleet consistent with a realistic schedule.<\/p>\n<p>This plan will ensure best value to the Navy for the completion of LCS ships 1-4, procurement of existing designs in fiscal 2008 and 2009 to fill the critical war-fighting gap and establish a sound framework for transition to a single selected design in fiscal 2010. The Navy will work closely with Congress on reprogramming actions necessary to bring this program forward.<\/p>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Based on a comprehensive review of the Littoral Combat Ship (LCS) acquisition program, Secretary of the Navy Donald C. Winter said he is prepared to lift a previously issued stop work order for construction of LCS 3. The ship is currently under contract to Lockheed Martin Corp. Maritime Systems &amp; Sensors unit, Moorestown, N.J. Lifting [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"sponsor":[],"class_list":["post-2471","post","type-post","status-publish","format-standard","hentry","category-general-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/2471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/comments?post=2471"}],"version-history":[{"count":0,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/2471\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/media?parent=2471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/categories?post=2471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/tags?post=2471"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/sponsor?post=2471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}