{"id":3077,"date":"2010-06-27T16:22:00","date_gmt":"2010-06-27T15:22:00","guid":{"rendered":"https:\/\/mercator.nfdtesting.uk\/propulsion-and-future-fuels-conference\/2010\/06\/27\/the-oscar-dyson-was-delivered-by-vt-halter-marine-in-may-2005\/"},"modified":"2026-08-26T22:24:09","modified_gmt":"2026-08-26T21:24:09","slug":"the-oscar-dyson-was-delivered-by-vt-halter-marine-in-may-2005","status":"publish","type":"post","link":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/news\/general-news\/the-oscar-dyson-was-delivered-by-vt-halter-marine-in-may-2005\/","title":{"rendered":"The Oscar Dyson was delivered by VT Halter Marine in May 2005"},"content":{"rendered":"<p>The drilling rig is en route to its first six-year drilling assignment for Petrobras offshore Brazil. Commencement of operations is expected at the end of July.<\/p>\n<p><em>West Orion<\/em> is a sixth generation, Friede &amp; Goldman ExD Class high specification design, ultra-deepwater, semi-submersible drilling unit designed with a dynamic positioning system and a water depth capacity up to 3,000m. The 98.82m long, 78.68m wide rig has a high load carrying capacity, an efficient drilling floor layout with improved safety and working environment measures.<\/p>\n<p>Alf C Thorkildsen, chief executive officer at Seadrill Management, says, \u201cWe are pleased to report the third consecutive on-time, on-budget delivery of a semi-submersible drilling rig to Seadrill from the Jurong shipyard. This is the third deepwater newbuild delivered to Seadrill that starts a long-term contract with Petrobras. The completion of our 10<sup>th<\/sup> newbuilding project within two years confirms Seadrill&#8217;s ability to manage complex projects within time and cost and is a great achievement for our organization and the people involved. It also confirms that the Seadrill strategy to order newbuild units with highly reputable yards like Jurong shipyard is paying off.\u201d<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Seadrill has taken delivery of a new deepwater semi-submersible drilling rig West Orion from the Jurong Shipyard in Singapore. The unit was delivered on budget and 10 days ahead of original delivery schedule.<\/p>\n","protected":false},"author":8,"featured_media":3078,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"sponsor":[],"class_list":["post-3077","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/3077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/comments?post=3077"}],"version-history":[{"count":1,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/3077\/revisions"}],"predecessor-version":[{"id":3079,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/posts\/3077\/revisions\/3079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/media\/3078"}],"wp:attachment":[{"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/media?parent=3077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/categories?post=3077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/tags?post=3077"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.motorship.com\/propulsion-and-future-fuels-conference\/wp-json\/wp\/v2\/sponsor?post=3077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}