Wärtsilä wins four-vessel engine order
Wärtsilä is to supply engines for four new Wagenborg cargo ships, supporting efficiency, reliability and future fuel flexibility
Wärtsilä is to supply its Wärtsilä 25 engines for four new 14,000 DWT general cargo vessels being built for Dutch shipowner and operator Royal Wagenborg, extending the companies’ cooperation on the EasyMax 2.0 fleet.
The engines were initially selected in 2025 for the first two vessels in the series and will now also power the next four ships. Built at Royal Niestern Sander shipyard in the Netherlands, the vessels form part of Wagenborg’s fleet renewal and sustainability programme. The latest order was booked in the fourth quarter of 2026.
Royal Wagenborg chief executive Niels Wage said: “The EasyMax 2.0 design builds on a proven vessel platform while incorporating new technologies that further improve efficiency and environmental performance. Wärtsilä’s engine technology is a key element of this concept, aiming for excellent fuel efficiency, operational reliability and the flexibility to support future sustainable fuel transitions.”
The Wärtsilä 25 features a modular architecture designed to accommodate alternative low- and zero-carbon fuels as they become commercially available. Its fuel efficiency and low consumption are intended to reduce emissions and operating costs while supporting the vessels’ long-term commercial value.
Each engine will also be equipped with a NOx reducer after-treatment system using selective catalytic reduction technology to reduce nitrogen oxide emissions and support compliance with environmental regulations.
Wärtsilä Marine president Roger Holm said reducing energy consumption remained one of the most effective ways to cut emissions and operating costs, adding that the engine combined current efficiency with flexibility for future decarbonisation.
Equipment deliveries are scheduled to begin in 2027.