Wärtsilä package for Taiwanese wind farm MIV

Wärtsilä has been selected to provide a range of solutions including a propulsion package for a large wind farm main installation vessel (MIV) to be built at the CSBC shipyard in Taiwan.

The new CDWE wind farm main installation vessel is due to begin operations in the Taiwan Straits in 2023. (Image: Wärtsilä)

Wärtsilä has been selected to provide a range of solutions including a propulsion package for a large wind farm main installation vessel (MIV) to be built at the CSBC shipyard in Taiwan.