REMARCCABLE on board CCS project design receives AiP

The conceptual design of a carbon capture system onboard an oil tanker has received approval in principle from ABS. The design was developed during the first phase of a two-year, three-phase pilot project to demonstrate end-to-end shipboard carbon capture at scale.

Stena Impero

The conceptual design of a carbon capture system onboard an oil tanker has received approval in principle from ABS. The design was developed during the first phase of a two-year, three-phase pilot project to demonstrate end-to-end shipboard carbon capture at scale.

AdvertisementLeaderboard 2
AdvertisementLeaderboard 3