Cryo LNG fuel system for Tallink ferry
Meyer Turku shipyard has ordered a high-power LNG fuel tank and gas handling system from Cryo AB, to be installed on a next-generation high-speed ferry under construction for Tallink Grupp.
The system consists of two 300 m³ horizontal vacuum insulated C-type tanks with associated gas handling and control systems, including Cryo’s new high-power LNG vaporisers.